S3 · GROUND-MOUNTED SOLAR EPC

Ground-Mounted Solar EPC (250 kWp – 2 MW+)

Open-land industrial and institutional solar power plants engineered from geotechnical soil checks and civil foundations through HT grid evacuation.

Request Proposal & Site Survey → Open Readiness Checklist (RPV-INDUSTRIAL)
WHO IT IS BUILT FOR

Ideal Applications

  • Industrial units with surplus MIDC or private land adjacent to factory premises
  • Educational campuses, resorts, and agro-processing facilities with constrained roof area
  • Captive behind-the-meter or net-billing solar buyers planning 250 kWp – 2 MW+ capacity
KEY TECHNICAL PARAMETERS

Reference Specifications

Land Requirement~3.5 to 4.5 acres per MWp depending on terrain & tilt angle
Evacuation Voltage415 V LT (smaller plants) or 11 kV / 22 kV / 33 kV HT tie-in
Foundation SpecM20/M25 RCC pedestals or driven galvanized piles per soil report
O&M ReadinessWide module-cleaning corridors and central water-wash hydrants
TURNKEY DELIVERABLES

Detailed Engineering & Execution Scope

  • Topographical layout, row-pitch inter-row shading optimization, and geotechnical/soil pull-out assessment
  • RCC pedestal foundations or driven hot-dip galvanized piling engineered for long-term corrosion resistance
  • Fixed-tilt galvanized mounting tables with organized DC string routing and UV-protected trenches
  • Multi-string inverter stations with shaded canopies, AC combiner panels, and SCADA weather/generation telemetry
  • Perimeter chain-link fencing, dedicated water-cleaning pipeline routing, and plant illumination
  • HT step-up transformer yard, VCB/RMU switchgear, and CEIG statutory charging executed with AAROHAN ELECTRICALS
For ground-mounted CAPEX projects, we recommend starting with an independent PVsyst yield simulation & financial model via WATTPVFY ↗, with HT transformer & CEIG statutory works integrated through AAROHAN ELECTRICALS ↗.
Regulatory & Performance Note: Final system capacity, net-metering approvals, and any applicable MNRE/state subsidies remain subject to site survey verification and prevailing DISCOM/MERC rules. Actual kWh generation varies with seasonal irradiance, shading, grid uptime, and cleaning discipline.