S5 · NET METERING, DISCOM & COMMISSIONING
Net Metering, DISCOM Liaison & IEC 62446 Commissioning
Structured regulatory coordination, bi-directional meter synchronization, and documented electrical testing for Maharashtra rooftop solar plants.
WHO IT IS BUILT FOR
Ideal Applications
- ROOFITPV turnkey EPC clients requiring end-to-end MSEDCL / Tata Power / Adani coordination
- Existing solar plant owners needing IEC 62446 pre-commissioning verification or meter sync support
- C&I plants requiring CEIG electrical inspector dossier coordination
KEY TECHNICAL PARAMETERS
Reference Specifications
| Regulatory Framework | MERC Grid Interactive Rooftop Renewable Energy Regulations & MNRE Guidelines |
| Testing Standard | IEC 62446-1 Commissioning & IS 3043 Earthing Verification |
| DISCOMs Covered | MSEDCL, Tata Power, Adani Electricity & MIDC/industrial feeders |
| Approval Timeline | Subject to prevailing DISCOM inspection & meter availability queues |
TURNKEY DELIVERABLES
Detailed Engineering & Execution Scope
- DISCOM portal registration (MSEDCL Mahadiscom / Tata Power / Adani Electricity) & technical feasibility tracking
- Preparation of Net Metering Connection Agreement, SLD, ALMM module serial list & BIS inverter certificates
- IEC 62446 field test pack: string Voc, polarity, Insulation Resistance (Megger), earth-pit resistance & anti-islanding test
- Bi-directional net meter & solar generation meter lab testing coordination and utility sealing
- CEIG drawing approval & statutory charging inspection executed via licensed partner AAROHAN ELECTRICALS where applicable
For installations above the prevailing statutory CEIG kW threshold or requiring HT metering/panel modifications, licensed electrical inspection & charging is coordinated seamlessly with AAROHAN ELECTRICALS ↗.
Regulatory & Performance Note: Final system capacity, net-metering approvals, and any applicable MNRE/state subsidies remain subject to site survey verification and prevailing DISCOM/MERC rules. Actual kWh generation varies with seasonal irradiance, shading, grid uptime, and cleaning discipline.